It may express shining visual effects and metallic texture simultaneously as it contains natural mica, acrylic chip and pearl and the premium interior product shows also excellent pollution-resistance and anti- discoloration.

 
Construction Method

1. Completely remove out any foreign materials, such as dust, oil, or water.
2. Repair small cracks, grooves, or damaged parts with Baro Putty.
3. Apply the color primer, which is in the same color as the lining material, to the surface, using a roller or a spray.
4. Be sure to do the curing work in advance in order to prevent any finishing material from flying out.
5. After the primer work is completely dry, adjust the air pressure of the compressor and the nozzle diameter of the spray suitably for the construction pattern, input a finishing material, and try a preliminary test to make the pattern that you want.
6. Put Pearl Shining into the gun, adjust the air pressure of the compressor, and apply on the whole in the thickness of 0.5~1.0mm for small particle-patterns.
7. Be careful not to make prominence and depression when spraying. And evenly spray to prevent the background from being seen.
8. Once it is completely dry after the spraying work, remove the chips and the prominence and depression on the surface, using #120~180 polishing paper.
9. After the sanding work, shake the dust off, using a brush or air.
10. In the case of mixing the lining material with chips, excessive mixing can change the color.
11. Use the coating material made by Baroco Construction Korea which is for pearl shining only. Before using the coating material, evenly mix by use of a hand mixer.
12. Use a spray gun to evenly apply.
13. The quantity of coating can make a difference in the color and the gloss so evenly apply.

 
Attention for the construction work

1. The temperature for the construction work should be over 5°C and the humidity should be less than 80%.
2. The drying work takes long time so before doing the finishing work, be sure to check the weather first. In case it is difficult to work further because of rain, immediately take a curing action for the existing applied surface which is not dry yet in order to prevent it from being damaged.
3. Protect the finishing material from any pollutants floating in the air, like dust and smoke, and from weather (less than 5°C temperature; over 80% humidity) until it becomes dry.
4. Remove the white part of the concrete surface in advance, and do the construction work when it is completely cured.
5. Repair any polluted or damaged part and do the construction work again.
6. In case it is judged that the pattern has a problem, stop the work, remove out the problem, take corrective actions for the causes, and then, work.
7. For the repair work, completely remove any pollutants from the existing walls, reinforce the surface with Baro Primer, and then, do the work.
8. For the surface that is not cured after the mesh finishing or the cement mortar finishing work, Don’t do the construction work.
9. Don’t do the construction work on the bottom surface that is coated with oil or asphalt.
10. Do not mix with other paints.
11. Prepare sufficient labor and equipment for consecutive works, and be careful not to have working joints or quality change.
12. Keep all the materials in the place which is out of the direct rays of the sun and well-ventilated (a dry, cool, and dark place in the temperature of5°C ~ 30°C).
13. In case you have to stop the work while doing the lining work, be careful not to make any spray joint.

 
Application

APT specialization- elevator hall, stairs, inner wall of corridor, ceiling and others
Commercial building- inner wall and ceiling of quality cafeteria, hotel, condominium and entertainment shops
Arts facilities- inner wall and ceiling of premium exhibition hall, multipurpose hall, gallery and concert hall.

 
Special Remark
Item Construction Method Construction
Area (Pail)
Drying Time Packing Unit
Pearl Shining
(Second Coating)
Spray 10-13m² Over 24 hours 22kg/Barrel
Pearl Shining
(Top Coating)
Spray 50-70m² Over 24 hours 15kg/Barrel
 
PROCESSING FLOW CHART
Process Materials Mixture
(Weight
Ratio)
Consumption
(kg/m²)
Painting Frequency Time Interval (HR) Method
In process Between
process
Final Curing  
Base
Coating
Completely remove impurities in the lower part.
Make even the surface with grooves,cracks, and fractures with the putty.
Under
Coating

Color Primer 100

0.15-0.2 1   Over 4   Brush,
roller,
Spray
Second
Coating
Pearl Shining 100 1.5-2.0 1   Over 24  

Spray
Gun
Diameter
3-5mm
Pressure
3-5kg/

Sanding Grind uneven parts and surface with sand paper 120~180.
Top
Coating
Barotop 1000 100 0.15-0.2       Over 4

Spray Gun
Diameter
3-5mm
Pressure
3-5kg/

Tap Water 5-10
 
Property
Category Result Remark
Composition Type 1 Water-soluble Acrylic Emulsion  
Specific Gravity 1.6±0.05  
Solid Volume Ratio 67±1%  
Viscosity 80,000±5,000CPS  
pH 7.5±0.5  
Coverage 1.5~2.0 ㎏/㎡  
Coating Thickness 0.5 ~ 1.0㎜  
Drying Time Less than 24 hrs Temp over 20℃,
Humidity lower than 80%
Packing Unit 22㎏/PL