| |
|
| |
 |
Home > PRODUCTS > Finishing Materials > Exterior Use |
|
|
| |
The product of European stucco pattern may express various textures by using a variety of tools. With the excellent elasticity,
durability and weather ability (weather-resistance), it may be applied to building’s outer wall, balcony and main entrance, making a building’s appearance gorgeous. |
| Construction Method |
1. Remove any foreign materials on the surface.
2. Repair the cracks and the damaged parts of the surface with Baro Putty and apply the Primer.
3. Construction method for Spray Stucco Pattern
- Do the curing work in advance to prevent a finishing material from flying out.
- Apply the Primer on the whole.
- The Spray Stucco Pattern should be sprayed two times.
- Adjust the air pressure of the compressor and the nozzle diameter of the spray suitably for the construction patterns, input a
finishing material, and test the construction to make the pattern you want.
- For the primary spraying work, put small quantity of water into the Baro Stucco, make the air pressure of the compressor big, and apply small particle patterns 0.5~1mm thick on the whole.
- After the primarily-sprayed surface is dry, adjust the nozzle and the air pressure of the spray, and spray big particles on the surface at the intervals of 20~30mm.
- Before the surface becomes slightly dry after the secondary spraying work, dip a roller or a trowel with gasoline or kerosene, and roll it up or press on the surface. (Do not give too much force for the well expression of patterns).
- Use a thin trowel (within 4mm thickness) to evenly spread the patterns left, right, up, and down.
- Protect the whole surface (for over 48 hours) until the product becomes dry after the work is completed
4. Spray pattern
- For the construction of spray pattern, adjust the air pressure of the compressor and the nozzle diameter of the spray suitably for the patterns.
- Primarily apply thin, moving the spray gun left and right. During the second application, maintain the patterns.
- The product can be constructed thick or thin so keep the consistent speed and intervals. The overlapped part can show a
difference in the color so be careful.
- Protect the whole surface (over 48 hours) until it becomes dry after the work is completed.
|
| |
| Attention for the construction work |
1. The surface should be flat and foreign substances removed in advance.
2. Basically apply primer on the base.
3. The air temperature should be higher than 5°C and relative humidity lower than 85%. (If it is installed before rain, it causes the curing shortage and problems in the product.)
4. As Baro stucco is a water-soluble product in the acryl system, it may cause some problems to keep or install it below zero or higher than 35°C.
5. Do not mix it with other paints. (A small amount of clean water is acceptable.)
6. Install the product after removing the whitened part on the concrete area in advance and only when it is completely cured.
7. For the surface that is not cured after the mesh finishing or the cement mortar finishing work, Don’t do the construction work.
8. Don’t do the construction work on the bottom surface that is coated with oil or asphalt.
9. For the repair work, completely remove any pollutants from the existing walls, reinforce the surface with Baro Primer, and then, do the work. |
| |
| Special Remark |
| Item |
Construction Method |
Construction Area
(Pail) |
Drying Time |
Packing Unit |
| Stucco |
Spray |
7-8m² |
Over 48 hours |
25kg/pail |
|
| |
| PROCESSING FLOW CHART |
| Process |
Materials |
Mixture
(Weight
Ratio) |
Consumption
(kg/m²) |
Painting
Frequency |
Time Interval (HR) |
Method |
| In process |
Between
process |
Final Curing |
|
Base
Coating |
Completely remove impurities in the lower part.
Make even the surface with grooves,cracks, and fractures with the putty. |
Under
Coating |
Color Primer 100 |
0.2-0.4 |
1 |
|
Over 24 |
|
Brush,
roller,
Spray |
| Joints |
Line drawing |
Design the location of joints and draw lines using inking lines or chalk. |
| Joint work |
Attach joints on lines marked in a designated space using corking agents.
Remove the cover of joints after second coating. |
Second
Coating |
Stucco |
100 |
5-7 |
1 |
|
Over 48 |
|
Air Spray
Gun
Diameter
3-6mm
Pressure
3-5kg/ |
Top
Coating |
Barotop 100 |
100 |
0.2-0.4 |
2 |
|
|
Over 4 |
Brush,
roller,
Spray |
| Tap Water |
5-10 |
|
| |
| Property |
| Category |
Result |
Remark |
| Composition |
Type 1 Water-soluble |
|
| Specific Gravity |
1.6±0.5 |
|
| Solid Volume Ratio |
81±1% |
|
| Viscosity |
CPS |
|
| pH |
8±0.5 |
|
| Coverage |
3.0~4.0 ㎏/㎡ |
|
| Coating Thickness |
1.3 ~ 2.0㎜ |
Stucco (Pattern) |
| Drying Time |
Spray |
|
| Packing Unit |
24~48 hrs |
|
|
| |
| Application |
- APT specialization( main entrance, an outer wall, pilotis & outer wall
- Commercial building- outer wall and ceiling of quality cafeteria, hotel,condominium and entertainment shops
- Arts facilities- outer wall and ceiling of premium exhibition hall, multipurpose hall,gallery and concert hall. |
| |
|
|
|